Drainage
2017-2021 FINANCIAL PLAN
The following table identifies the key performance measure that will assist the Drainage
Utility in tracking its progress and monitoring its contribution to building a sustainable
Surrey.
PERFORMANCE MEASURES
Division
Performance Measures
(Sustainability Theme)
Actual
2016
Budget
2017 2018 2019 2020 2021
Drainage
Utility
Length of Drainage Mains
Renewed or Replaced
(Infrastructure)
4,330
2,000
2,000 2,000 2,000 2,000 2,000
Number of Soil Site Inspections
(Infrastructure)
194
200
220
240
260
300
300
Budget
2016
Develop a strategy to revise our design
criteria requirements in response to
changing rainfall patterns;
Improve the protection for the Colebrook
area from coastal storm surges by
completing the first phase of dyke
improvements along the Colebrook dyke
from BNSF Rail to Highway 99;
Conduct a review of the maintenance
schedule of instream diversion
structures to ensure they are
consistently allowing for fish passage
as designed;
Conduct a corrosion assessment of old
Corrugated Steel Pipe (CSP) & Corrugat-
ed Metal Pipe (CMP) culverts. Work will
involve corrosion study and possibly the
use of ground penetrating radar in areas
of concern;
Update Integrated Storm Water Manage-
ment Plans (ISMPs) based on best avail-
able science, Adaptive Management
Findings (AMF) and climate change pre-
dictions; and,
Update Lowland functional plans based
on new science, additional monitoring
and climate change predictions.
INFRASTRUCTURE