Drainage

2017-2021 FINANCIAL PLAN

The following table identifies the key performance measure that will assist the Drainage

Utility in tracking its progress and monitoring its contribution to building a sustainable

Surrey.

PERFORMANCE MEASURES

Division

Performance Measures

(Sustainability Theme)

Actual

2016

Budget

2017 2018 2019 2020 2021

Drainage

Utility

Length of Drainage Mains

Renewed or Replaced

(Infrastructure)

4,330

2,000

2,000 2,000 2,000 2,000 2,000

Number of Soil Site Inspections

(Infrastructure)

194

200

220

240

260

300

300

Budget

2016



Develop a strategy to revise our design

criteria requirements in response to

changing rainfall patterns;



Improve the protection for the Colebrook

area from coastal storm surges by

completing the first phase of dyke

improvements along the Colebrook dyke

from BNSF Rail to Highway 99;



Conduct a review of the maintenance

schedule of instream diversion

structures to ensure they are

consistently allowing for fish passage

as designed;



Conduct a corrosion assessment of old

Corrugated Steel Pipe (CSP) & Corrugat-

ed Metal Pipe (CMP) culverts. Work will

involve corrosion study and possibly the

use of ground penetrating radar in areas

of concern;



Update Integrated Storm Water Manage-

ment Plans (ISMPs) based on best avail-

able science, Adaptive Management

Findings (AMF) and climate change pre-

dictions; and,



Update Lowland functional plans based

on new science, additional monitoring

and climate change predictions.

INFRASTRUCTURE

270