Kolter Homes Policies and Procedures
Policy No. 5.1.1, Spec Home Color Selection and Cutoff
2nd Floor Stairs Installed
2nd Floor Stairs Installed
Install 3rd Floor Block
Install 3rd Floor Block
Prep/Steel 3rd Floor Beam
Prep/Steel 3rd Floor Beam
Pour 3rd Floor Beam
Pour 3rd Floor Beam
Install/Build Wall Panels
Install/Build Wall Panels
Install Party Wall Framing
2
Install Party Wall Framing
Install 3rd Floor Party Wall Framing
Install 3rd Floor Party Wall Framing
Install/Build 3rd Floor Wall Panels
Install/Build 3rd Floor Wall Panels
Block Rake Walls
Block Rake Walls
Pour Rake Wall
Pour Rake Wall
Roof Trusses Installed
Roof Trusses Installed
Roof Sheathing
Roof Sheathing
Sheathing and Engineering Complete
Roof Sheathing/Eng. Inspection
First Layer Firewall Complete
First Layer Firewall Complete
Firewall Complete
Firewall Complete
House Wrap Complete
House Wrap Complete
Roof Dry-In
Roof Dry-In
Framing Complete
Framing Complete
Hot Mop/Peel & stick
Hot Mop/Peel & stick
Hot Mop/Peel & stick
Hot Mop/Peel & stick
Roof Installed
3
Roof Installed
Window Install
Window Install
HVAC Rough
HVAC Rough
Plumbing Rough
Plumbing Rough
Electric Rough
Electric Rough
Management Frame Walk
Management Frame Walk
Framing Inspection
Framing Inspection
Homeowner Pre-Drywall Walk-Thru
Pre-Drywall Orientation
Stone Installed
Brick/Stone Installed
Brick Installed
Brick/Stone Installed
Siding Complete
Siding Complete
Stucco Plaster Complete
Stucco Plaster Complete
Exterior Paint Complete
Exterior Paint Complete
Spray Foam Insulation
Spray Foam Insulation
Insulation
Insulation
Drywall Hung/Installed
Drywall Installed
Drywall Screw Inspection
4
Drywall Screw Inspection
Drywall Finish
Drywall Finish
Drywall Finish/Spray
Drywall Finish/Spray
Interior Paint 1st Coat
Interior Paint 1st Coat
Install Garage Door
Install Garage Door