5
HSE Inspection
§
Scheduled HSE C& I Inspection
§
Normal inspector ill, so Specialist Inspector of Health and
Safety EC&I deputised
§
Reviewed Functional Safety documents
§
A number of actions were raised
§
Requested more information on the SIL 2 overfill SIF
justification
§
Documents sent by terminal operator included SIL
Certificate and supporting Failure Mode Effects and
Diagnostic Analysis (FMEDA) and Proven-in Use report
©ABBGroup
October23,2016|Slide9
HSE Specialist Inspector’s Response
§
After examining the documents the inspector
stated: -
§
The information would not form the basis of
a suitable demonstration that Relevant Good
Practice has been met
§
The company were advised to consider
alternate measures
§
In effect the HSE Specialist Inspector has said
‘No’ to the SIL 2 Certificate
§
The Design Contractor and Terminal Owner
thought they had bought a ‘SIL 2’ solution –
what went wrong?
§
Terminal owner gave me a call
©ABBGroup