Background Image
Previous Page  27 / 56 Next Page
Information
Show Menu
Previous Page 27 / 56 Next Page
Page Background

25

CONSTRUCTION WORLD

FEBRUARY

2015

PROJECTS AND CONTRACTS

It is set to include showrooms, retail

elements and concept stores on the

ground floor which are accessible from

the piazza – a tranquil space nestled between

the three buildings that complete the enclosure.

Phase one tenants include an international

leader in global business and finance informa-

tion, a major South African bank and a new

flagship gym.

Paragon Architects had already designed

two of the three buildings around the future

piazza, which created a canvas from which to

draw. Working with generated site line anal-

yses and sun studies the conceptual design

was specifically created to allow sunlight into

the public space, essentially using sunlight to

chisel form.

From the outset, Paragon Architects was

aware of the requirement of cellular office

space. To ensure that all offices were exposed

to natural light, two wings were generated so

that external offices and internal offices were

equally exposed, essentially ensuring that every

office is a perimeter office.

This building is much higher than the

first two phases and while a common design

language binds the three buildings, the

constructionmaterials define their individuality.

While unitised aluminium panels are the

dominant material in the Marsh building, in the

Bowman Gilfillan building it is glass.

“The glazing reflects the latest glass

technology in terms of light and dark and

also day and night experiences – creating a

VISUALISING THE FINAL PRODUCT

One of Africa’s top law firms will be the anchor tenant in the brand

new 18-floor office building currently being constructed on the

corner of Alice Lane and Fifth Street in Sandton’s commercial centre.

striking visual effect,” says Anthony Orelowitz

of Paragon.

“As this building is only set for completion

in a couple of years’ time, by making use of

Autodesk Revit we are able to not only design

the shell of the building, but completely

visualise the finished effect, ensuring that

the building is not only functional and envi-

ronmentally friendly, but also aesthetically

stunning as well.”

The entire precinct is aimed at achieving a

Four Star Green Star rating.

>

Visualisation reflects the vision in the new 18-storey glass creation in Sandton CBD.