Background Image
Table of Contents Table of Contents
Previous Page  18 / 68 Next Page
Information
Show Menu
Previous Page 18 / 68 Next Page
Page Background

wiredInUSA - May 2016

18

Clinton High Frequency Spark Tester

Auto calibration with Clinton STCAL system

Pinhole and bare wire di erentiation

Detachable display can be located 25’ away

Flexible front panel password security

Optional Ethernet/IP, PROFINET, PROFIBUS

Modbus TCP and Analog communications

Easy connection to most PLCs

Voltage Watchdog

(860) 669-7548

www.clintoninstrument.com

HF-15B Spark Tester

NEW!

SolarWorld Americas will supply 17.5MW

of solar power modules for a plant in the

Mojave Desert, west of Las Vegas.

The plant will use over 51,000 340W

modules produced by SolarWorld in

Hillsboro, Oregon, with installation by

SolarWorld’s

longstanding

partner,

Bombard Renewable Energy. The project

is expected to be completed by the end

of this summer.

The Mojave Desert plant is the latest

project by SolarWorld worldwide. In

January 2016, the company secured the

order for a 10.5MWplant inOregon, and is

also building a 5MW plant in Great Britain

and a 2MW solar park in the Netherlands.

SolarWorldalready recordeda significant

increase in shipments for large-scale

solar power projects in 2015, with a

year-on-year increase of 50 percent. The

rise in the number of repowering projects

has also contributed to the increasing

share of large-scale projects. Besides

Germany, the majority of the plants are

located in France, Great Britain and

the US. The MENA region will also play a

significant role for large-scale projects in

the future.

Solar, worldwide