CI/SfB

(74)

February 2014

Uniclass L721

Blue Book

| Ideal Standard | Armitage Shanks

07

A speedy installation that had

to interface seamlessly with the

existing plumbing blueprint.

Stansted Airport

Location:

London

Challenge:

Support the airport’s facility

management team to refresh a

washroom used by over 1,000

passengers per day.

3.

Speed of delivery was a key consideration

for LPL Construction when choosing the

product supplier for this project. The

refurbishment required the washroom to

be closed over a period of seven weeks

so disruption was to be kept minimal.

LPL Construction vetted a number of

suppliers to ensure exact timescales could

be, and would be adhered to.

Ideal Standard provisioned the Airside

80cm washroom basin from its Armitage

Shanks brand, which incorporates an

integral shelf for necessities and a bold

splash-back to keep the wash area clean.

Made from Fine Fireclay which provides

improved tolerance for larger pieces of

sanitaryware. Its hidden pipework also

lends itself to an attractive and easy to

maintain washroom.

The large area of the basin provides

ample space for passengers without

the need to bunch up, meeting the

ergonomic challenges associated with a

high-end feel washroom.

For the sanitaryware Ideal Standard

advised matching the Airside basin with

the Contour Vitreous china bowl urinal,

which is panel-mounted and incorporates

a concealed high level cistern, pipework

and trap. The Contour urinal is designed

to be hygienic and its smooth profile

conceals the flushing inlet and waste

trap, ensuring the highest standards

of protection from infection carrying

bacteria. A timed self-rinse application

also stops bacteria build-up.

Stansted washroom installation

Introduction