Local Fuel PLC – The Shoreham Oil Terminal

SIS Management of Functional Safety – Safety Plan

P & I Design Ltd

DOCUMENT NO:LF364004_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: D DATE: 07.06.16

Tel: + 44 (0)1642 617444

PAGE 14 OF 28

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Activity History – Terminal in Local Fuel PLC ownership

Date

Reference

Description

Roles

Persons assigned

27.05.15

2

LF364006_RPT

Revision A

Original Issue

P&I Design

Ltd

Local Fuel

D S Regan BEng

L Salvidge

09.05.16

2

LF364006_RPT

Revision B

Following FSA 5

P&I Design

Ltd

Local Fuel

D S Regan BEng

L Salvidge

13.05.16

2

LF364006_RPT

Revision C

Updated following

2016 proof test

P&I Design

Ltd

Local Fuel

D S Regan BEng

L Salvidge

10.3 Design and Engineering Verification History

Lifecycle

phase in

Figure 1

Verification

9

Utilise QSF011_SIS – Stage 2 – Safety Instrument Design - Checklist 2 - General

9

Utilise QSF012_SIS – Stage 2 – Safety Instrument Design - Checklist 3 – Components & Sub-Systems

9

Utilise QSF013_SIS – Stage 2 – Safety Instrument Design - Checklist 4 – Interfaces

SI157105_RPT Revision A – Compliance Document - Section

5 – Checklist 2 - General

QSF011 did not exist under Chevron ownership, all checklist

were contained in a compliance document

SI157105_RPT Revision A – Compliance Document - Section

5 – Checklist 3 – Components & Sub Systems

QSF012 did not exist under Chevron ownership, all checklist

were contained in a compliance document

SI157105_RPT Revision A – Compliance Document - Section

5 – Checklist 4 – Interfaces

QSF013 did not exist under Chevron ownership, all checklist

were contained in a compliance document

10.4 Design and Engineering Validation Verification History

Lifecycle

phase in

Figure 1

Validation - Terminal in Chevron/Valero ownership

9/9a

Utilise QSF014_SIS – Stage 3 – SIS Validation - Checklist 5 – Factory Acceptance Test – Planning

9/9a

Utilise QSF015_SIS – Stage 3 – SIS Validation - Checklist 6 – Factory Acceptance Test

9/9a

Utilise QSF016_SIS – Stage 2 – SIS Validation - Checklist 7 – Installation & Pre-Commissioning (Prior to SAT)

SI157105_RPT Revision A – Compliance Document - Section

6 – Checklist 5 – FAT - Planning

QSF014 did not exist under Chevron ownership, all checklist

were contained in a compliance document

SI157105_RPT Revision B – Compliance Document - Section

6 – Checklist 6 – FAT

QSF015 did not exist under Chevron ownership, all checklist

were contained in a compliance document

SI157105_RPT Revision B – Compliance Document - Section

6 – Checklist 7 – Installation & Pre-Commissioning (Prior to

SAT)

QSF016 did not exist under Chevron ownership, all checklist

were contained in a compliance document