Local Fuel plc - Shoreham Oil Terminal

Safety Instrument System Functional Safety Assessment Stage 5

P & I Design Ltd

DOCUMENT NO: LF364100_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 07.06.2016

Tel: + 44 (0)1642 617444

PAGE 32 OF 51

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

The SIS sensors are all displayed on the HMI, but again this is indication only and cannot

interfere with the SIF.

Maintenance Issues:

No issues have been identified.

Functional Capability:

The functional capability of the SIS has not been affected by this modification. The required

protection remains as defined, in that any high level on Tanks 1, 2,3 & 4 will automatically

close the jetty import pipeline valve XV162.

5.8

Training

As stated previously SIS awareness training has been conducted for all operational staff of

Local Fuel plc.

5.9

Further Safety Assessments

Other than for any FSA 5’s due to modification, which will be conducted as and when, it is

not expected to perform a further FSA 4 for approximately three years when Local Fuel plc

will have approximately five years of Terminal ownership and experience in operation of these

systems.

5.10 Compliance to BS EN 61511

The SIS, in general, is based upon the requirements of the BS EN 61511 lifecycle. Additional

lifecycle documentation has been created and updated as a result of this FSA, to assist in proof

testing and management of functional safety of the SIS. The PFD of the installed system

complies to the requirements of the LOPA and HFT of BS EN 61511, by the utilisation of SIL

certified components.

5.11 Separate Hazards

The FSA discussed if any additional hazards were created by having the SIS. The only

identified hazard is the un-expected closure of the import valve resulting in an increased back

pressure to the ship. This is a know issue and the valve is specified to close slowly, typically

90 seconds, furthermore, a siren is provided at the jetty to inform the ship that the SIS has

activated and the valve is closing.

5.12 Other Protection Layers

Within the LOPA a number of other protection layers, mitigation layers, enabling events and

cross checks were included that were not part of the Safety Instrumented System but need to

be operated and maintained as they are fundamental to the calculated SIL of the SIS. It is

considered important that these non SIS protection layers are monitored to ensure they are

independent, effective and auditable.