Base Case Model

a)

a) Czech Republic partially implemented the provisions for NDM off-takes. In Austria, NDM forecasts are provided by DAM based on data from DSOs.

Bulgaria reported that data for IDM off-takes is provided to NUs only as no NDMs are connected to the transmission system.

b) Sweden reported that no NDM provisions are implemented due to minor part of the market and no receiving interest from NUs. Reported as not

applicable due to no daily and/or non-daily metered off-take points connected to the transmission system, in Slovakia and Greece.

Variant 1

Variant 2

Under discussion /n/a

b)

Map 6: 

Information model chosen by NRA by 1 October 2016

The majority (19) of countries (AT, BE/LU, BG,

CZ, DE, DK, ES, FR, HU, IE, IT, LT, NL, PL

34)

, PT,

SI, UK-GB and UK-NI) reported having chosen

an information model, except six countries in-

cluding Estonia (EL, HR, RO, SE and SK) by

1 October 2016. While Portugal finalised the

process by applying “Variant 2”, Croatia and Ro-

mania responded that it is still in progress. Slo-

vakia and Greece repeated as a reason having

no non-daily metered off-take points connected

to the transmission system.

From those countries with an implementation

deadline by 1 October 2015 implementation

34) For the Polish TGPS balancing zone the information model provisions are reported as not applicable as it has no non-daily metered off-takes and

no DSO is connected to the system.

changes and/or updates for IDM and/or NDM

offtake points have been provided by three

countries (DE, LT and PL).

Of the five countries with an implementation

deadline by 1 October 2016, three countries (IT,

ES and PT) reported the implementation by

1 October 2016. One country (CZ) partially

implemented the provisions by 1 July 2016. In

Croatia no information model is in place as the

decision on it is still in progress.

Table 4.3 to 4.7 in Annex IV

provide additionally

an overview of countries per information model.

a) Czech Republic partially imple-

mented the provisions for NDM

off-takes. In Austria, NDM fore-

casts are provided by DAM based

on data from DSOs. Bulgaria

reported that data for IDM off-

takes is provided to NUs only as

no NDMs are connected to the

transmission system.

b) Sweden reported that no NDM

provisions are implemented due

to minor part of the market and no

receiving interest from NUs.

Reported as not applicable due to

no daily and/or non-daily metered

off-take points connected to the

transmission system, in Slovakia

and Greece.