Base Case Model
a)
a) Czech Republic partially implemented the provisions for NDM off-takes. In Austria, NDM forecasts are provided by DAM based on data from DSOs.
Bulgaria reported that data for IDM off-takes is provided to NUs only as no NDMs are connected to the transmission system.
b) Sweden reported that no NDM provisions are implemented due to minor part of the market and no receiving interest from NUs. Reported as not
applicable due to no daily and/or non-daily metered off-take points connected to the transmission system, in Slovakia and Greece.
Variant 1
Variant 2
Under discussion /n/a
b)
Map 6:
Information model chosen by NRA by 1 October 2016
The majority (19) of countries (AT, BE/LU, BG,
CZ, DE, DK, ES, FR, HU, IE, IT, LT, NL, PL
34)
, PT,
SI, UK-GB and UK-NI) reported having chosen
an information model, except six countries in-
cluding Estonia (EL, HR, RO, SE and SK) by
1 October 2016. While Portugal finalised the
process by applying “Variant 2”, Croatia and Ro-
mania responded that it is still in progress. Slo-
vakia and Greece repeated as a reason having
no non-daily metered off-take points connected
to the transmission system.
From those countries with an implementation
deadline by 1 October 2015 implementation
34) For the Polish TGPS balancing zone the information model provisions are reported as not applicable as it has no non-daily metered off-takes and
no DSO is connected to the system.
changes and/or updates for IDM and/or NDM
offtake points have been provided by three
countries (DE, LT and PL).
Of the five countries with an implementation
deadline by 1 October 2016, three countries (IT,
ES and PT) reported the implementation by
1 October 2016. One country (CZ) partially
implemented the provisions by 1 July 2016. In
Croatia no information model is in place as the
decision on it is still in progress.
Table 4.3 to 4.7 in Annex IVprovide additionally
an overview of countries per information model.
a) Czech Republic partially imple-
mented the provisions for NDM
off-takes. In Austria, NDM fore-
casts are provided by DAM based
on data from DSOs. Bulgaria
reported that data for IDM off-
takes is provided to NUs only as
no NDMs are connected to the
transmission system.
b) Sweden reported that no NDM
provisions are implemented due
to minor part of the market and no
receiving interest from NUs.
Reported as not applicable due to
no daily and/or non-daily metered
off-take points connected to the
transmission system, in Slovakia
and Greece.
22 |
ENTSOG BAL NC Monitoring Report 2016