Nominations (Chapter IV of BAL NC)

Table 3.4: Application of rules for unbundled and bundled capacity

Country

Do you apply the rules

for unbundled also to

bundled capacity acc.

to art. 12(3) by

1 October 2016?

Have you cooperated with the adjacent TSO for the purpose of implementing nomination and re-nomination

rules for bundled capacity products at interconnection points (art. 12.3)?

If yes, please explain the outcome.

AT

Yes

The Austrian TSOs cooperated with the adjacent TSO(s) for the purpose of implementing nomination and

re-nomination rules for bundled capacity products at interconnection points and basically agreed on the main

parts of the process also there are still some details to finalise. GCA and TAG are ready to offer Single Sided

Nominations (SSN) on all Entry/Exit Points in an automatic process. This SSN can also be used for bundled

auctioned capacity.

BE/LU

Yes

Fluxys and Creos cooperated with the adjacent TSOs for the purpose of implementing nomination and

re-nomination rules for bundled capacity products at interconnection points and basically agreed on the main

parts of the process.

BG

Yes

The outcome is provided in the signed Interconnection agreements.

CZ

Yes

Single nomination is established at all interconnection points

DE

Yes

The TSOs within the two German market areas Net Connect Germany and Gaspool cooperated with the

adjacent TSOs for the purpose of implementing nomination and re-nomination rules for bundled capacity

products at interconnection points and basically agreed on the main parts of the process although there are

still some details to finalise.

DK

No

Single nomination will be implemented later this year.

EE*

No

No

EL

No

The same nomination rules apply for bundled and unbundled capacity products; however these rules are not

compatible with articles 13 to 16 of the Regulation.

ES

Yes

Enagás cooperated with the adjacents TSOs for the purpose of implementing nomination and re-nomination

rules for bundled capacity products at interconnection points and basically agreed on the main parts of the

process.

FR

Yes

GRTgaz – Added in interconnection agreements; TIGF – single sided nomination implemented with Enagás.

HR

Yes

Plinacro cooperated with the adjacent TSO for the purpose of implementing nomination and re-nomination

rules for bundled capacity products at interconnection points and basically agreed on the main parts of the

process although there are still some details to finalise.

HU

SSN is available at HU/CRO, HU/RO, SSN is under discussion at HU/AT.

IE

Yes

Interconnection Agreements and associated agreements are in place with all adjacent TSOs.

IT

Yes

Snam Rete Gas signed IPAs with adjacent TSOs at EU IPs.

LT

No

No

NL

Yes

BBL cooperated and agreed with National Grid and GTS on the implementation of (re)nomination rules for

bundled capacity.

GTS – GTS cooperated with the TSOs within the two German market areas Net Connect Germany and Gaspool

for the purpose of implementing nomination and re-nomination rules for bundled capacity products at inter-

connection points and basically agreed on the main parts of the process although there are still some details

to finalise. GTS cooperated with Fluxys and BBL for the purpose of implementing nomination and

re-nomination rules for bundled capacity products at interconnection points and basically agreed on the main

parts of the process.

PL

Yes

H-gas/TGPS: The TSOs agreed the roles (of Active and Passive TSO) in the single-sided nomination procedure

at each interconnection point and offer the network users such possibility to use single-sided nomination.

L-gas: There are no interconnection points is the low-methane gas balancing area.

PT

Yes

The TSO REN cooperated with the adjacent TSO Enagás for the purpose of implementing nomination and

re-nomination rules for bundled capacity products at interconnection points and basically agreed on the main

parts of the process although there are still some details to finalise.

RO

Yes

Transgaz cooperated with the adjacent TSOs (FGSZ and Bulgartransgaz) for the purpose of implementing

nomination and re-nomination rules for bundled capacity products at interconnection points and basically

agreed on the main parts of the process although there are still some details to be finalised.

SE

No

No

SK

Yes

In line with BAL NC on respective interconnection points.

SI

Yes

Procedures are aligned in the Interconnection Agreements (IA).

UK-GB

Revised interconnection agreements to take account of new nomination arrangements.

UK-NI

Jointly developed Nom rules at IP.

60 |