Table 3.6: Overview of IPs with coexistence of hourly and daily regimes and other points and IPs

where (re-)nomination rules apply

Country

Indication of IPs where hourly and daily nomination regimes

co-exist at the two sides of one (or more) IP(s) of your balancing

zone (art. 16)?

Did the NRA determine that the nomination and re-nomination

procedure is required at points other than IPs according to art. 18

and do the principles apply according to art. 18.2? (Please indicate

these other points e. g. storage points, LNG points, end consumer

points.)

AT

IP Arnoldstein (AT)/Tarvisio (IT)

IP Baumgarten (SK/AT)

Storage, production, biogas and end consumers

BE/LU 

1)

Alveringem (BE/FR), Blaregnies (BE)/Blaregnies Troll (FR)

(Blaregnies Segeo)

BG

end-consumer point, distribution networks

CZ

Waidhaus (CZ/DE), Brandov Opal (CZ/DE), Brandov Stegal Hora

sv. Kateřiny – Olbernhau (CZ/DE), Hora sv. Kateřiny (CZ/DE),

Český Těšín (CZ/ PL)

virtual storage points, directly connected customers

DE

Obergailbach (FR)/Medelsheim (DE)

Storages

ES

The provisions relating to nomination processes apply to all

connection points with the transmission network

FR

GRTgaz – Taisnières FR/BE), Obergailbach (FR/DE),

Jura (FR/CH), Oltingue (FR/CH)

TIGF – No

HR

Rogatec (HR/SI), Drávaszerdahely (HR/HU)

All entry and exit points

HU

IE

Storage Points and Domestic Entry and Exit Points

IT

Tarvisio (IT)/Arnoldstein (AT)

Non-EU entry/exit points (Gela, Mazara del Vallo, Passo Gries,

Bizzarone, San Marino), LNG entry, storage entry/exit, indigenous

production (natural gas and biomethane) entry, delivery to other

transmission networks, redelivery points (distribution, final

customers)

LT

LNG point, domestic exit point.

NL

BBL 

2)

: Bacton (BBL)/Bacton (IUK)

GTS – No

GTS – All network points except the ones to DSO-networks.

PL

PL H-gas: Cieszyn (PL)/

Český Těšín

(CZ)

H-gas: The nominations are required regarding storage points,

LNG point, end consumers points, production facilities.

L-gas: The nominations are required regarding end consumers

points.

TGPS: n/a

PT

Nominations are required for all network connection points with

storage facilities, LNG Terminal facilities and CCGTs end consumers.

RO

The entry points in the NTS from the production fields, from the

underground storages; Exit points from the NTS towards the end

consumers, towards the distribution systems and towards the

underground storages.

SE

SK

IP Baumgarten (SK/AT)

SI

IP Gorizia (IT)/Šempeter (SI) 

3)

Aggregated end consumer points

UK-GB

Bacton (IUK)/Bacton (BBL)

1) In Belgium and Luxembourg the stakeholders have been consulted regarding harmonisation: Stakeholders

are aware of the situation and did not raise any problem. Contracts were not adapted.

2) In the Netherlands the stakeholders have been consulted regarding harmonisation:

https://www.bblcompany.com/about-bbl/consultations-implementation-information/$1125/$1126

.

3) In Slovenia, TSO collects all nominations on hourly bases. In the matching process, TSO aggregates hourly

nominations of network users to daily values in order to meet the agreed format for data exchange with

adjacent TSO. Since TSO is capable to exchange data with adjacent TSO both on hourly or daily level, the

interconnection point was declared as a point where hourly and daily regime for nominations co-exist.