Table 3.6: Overview of IPs with coexistence of hourly and daily regimes and other points and IPs
where (re-)nomination rules apply
Country
Indication of IPs where hourly and daily nomination regimes
co-exist at the two sides of one (or more) IP(s) of your balancing
zone (art. 16)?
Did the NRA determine that the nomination and re-nomination
procedure is required at points other than IPs according to art. 18
and do the principles apply according to art. 18.2? (Please indicate
these other points e. g. storage points, LNG points, end consumer
points.)
AT
IP Arnoldstein (AT)/Tarvisio (IT)
IP Baumgarten (SK/AT)
Storage, production, biogas and end consumers
BE/LU
1)
Alveringem (BE/FR), Blaregnies (BE)/Blaregnies Troll (FR)
(Blaregnies Segeo)
–
BG
–
end-consumer point, distribution networks
CZ
Waidhaus (CZ/DE), Brandov Opal (CZ/DE), Brandov Stegal Hora
sv. Kateřiny – Olbernhau (CZ/DE), Hora sv. Kateřiny (CZ/DE),
Český Těšín (CZ/ PL)
virtual storage points, directly connected customers
DE
Obergailbach (FR)/Medelsheim (DE)
Storages
ES
–
The provisions relating to nomination processes apply to all
connection points with the transmission network
FR
GRTgaz – Taisnières FR/BE), Obergailbach (FR/DE),
Jura (FR/CH), Oltingue (FR/CH)
TIGF – No
–
HR
Rogatec (HR/SI), Drávaszerdahely (HR/HU)
All entry and exit points
HU
–
–
IE
–
Storage Points and Domestic Entry and Exit Points
IT
Tarvisio (IT)/Arnoldstein (AT)
Non-EU entry/exit points (Gela, Mazara del Vallo, Passo Gries,
Bizzarone, San Marino), LNG entry, storage entry/exit, indigenous
production (natural gas and biomethane) entry, delivery to other
transmission networks, redelivery points (distribution, final
customers)
LT
–
LNG point, domestic exit point.
NL
BBL
2)
: Bacton (BBL)/Bacton (IUK)
GTS – No
GTS – All network points except the ones to DSO-networks.
PL
PL H-gas: Cieszyn (PL)/
Český Těšín
(CZ)
H-gas: The nominations are required regarding storage points,
LNG point, end consumers points, production facilities.
L-gas: The nominations are required regarding end consumers
points.
TGPS: n/a
PT
–
Nominations are required for all network connection points with
storage facilities, LNG Terminal facilities and CCGTs end consumers.
RO
–
The entry points in the NTS from the production fields, from the
underground storages; Exit points from the NTS towards the end
consumers, towards the distribution systems and towards the
underground storages.
SE
–
–
SK
IP Baumgarten (SK/AT)
–
SI
IP Gorizia (IT)/Šempeter (SI)
3)
Aggregated end consumer points
UK-GB
Bacton (IUK)/Bacton (BBL)
–
1) In Belgium and Luxembourg the stakeholders have been consulted regarding harmonisation: Stakeholders
are aware of the situation and did not raise any problem. Contracts were not adapted.
2) In the Netherlands the stakeholders have been consulted regarding harmonisation:
https://www.bblcompany.com/about-bbl/consultations-implementation-information/$1125/$1126.
3) In Slovenia, TSO collects all nominations on hourly bases. In the matching process, TSO aggregates hourly
nominations of network users to daily values in order to meet the agreed format for data exchange with
adjacent TSO. Since TSO is capable to exchange data with adjacent TSO both on hourly or daily level, the
interconnection point was declared as a point where hourly and daily regime for nominations co-exist.
62 |
ENTSOG BAL NC Monitoring Report 2016