Annex IV: Information Provision
(Chapter VIII of the BAL NC)
Table 4.1: Chosen model for information provision by 1 October 2016
COUNTRY
INFORMATION PROVISION MODEL
AT*, CZ, DK, ES, FR, IE, IT, LT, PL*, UK-GB, UK-NI (11 countries)
Base case
BE/LU, BG, HU, NL, SI (6 countries)
Variant 1
DE, PT
1)
(2 countries)
Variant 2
EE**, HR**, RO, SE** (4 countries)
No final decision taken by the NRA
EL, SK (2 countries)
No (no NDM off-takes)
* In Austria at TSO Level entry/exit nomination is equal to allocation, final customer data are provided
mainly by the respective DSO, NDM forecasts are provided by DAM based on data from DSO`s. Data
provided for this table is based on chapter 2 of the Austrian "other market rules". In the Polish TGPS
balancing zone no NRA decision is made as there are no non-daily metered off-takes in this balancing area
and no DSO system is connected to the TSO system.
** Estonia holds derogation. In Croatia the decision process is still ongoing. Sweden reported that no NDM
provisions are implemented due to minor part of the market and no receiving interest from NUs.
*** In Slovakia no NRA decision is made as there are no non-daily metered off-takes in this balancing area.
1) In Portugal the information model applied after the entering into force of the NC BAL. The outcome of the
obligatory public consultation was the acceptance of the model variant 2.
http://www.erse.pt/pt/consultaspublicas/historico/Paginas/54.aspxTable 4.2: Optional: Descriptions of the implemented model
COUNTRY LINK TO DESCRIPTIONS OF THE IMPLEMENTED MODEL
AT
https://www.e-control.at/documents/20903/443907/SoMaGa_2_Ost_Kommunikation_Fristenlauf_MG-Ost_201610_en.pdf/a59c96c8-5a7d-4b34-ad54-7870c4eb36faBG
http://bulgartransgaz.bg/files/useruploads/files/amd/VTP_news/pravila-balansirane-gas.pdfCZ
http://www.eru.cz/cs/-/vyhlaska-c-349-2015-sb-o-pravidlech-trhu-s-plyn-1DE
https://www.gaspool.de/fileadmin/download/regulatorisches/kov_ix/cooperation_agreement_ix_best_practice_guidelines_market_processes_management_of_gas_ balancing_groups_1.pdf(page 71 to 73)
https://www.net-connect-germany.de/Portals/2/06.07.2016_LF%20BKM_englisch.PDFES
http://www.boe.es/boe/dias/2015/12/31/pdfs/BOE-A-2015-14345.pdfIE
Part E (Section 1.7) of the ROI Code of Operations
IT
Snam Rete Gas Network Code, chapter 9 paragraph 1, at
http://www.snamretegas.it/en/services/Network_Code/Aree/Codice_di_rete.htmlNL
https://www.gasunietransportservices.nl/en/shippers/balancing-regime/sbs-and-posPL
H-gas:
http://en.gaz-system.pl/fileadmin/pliki/iriesp/en/TNCv25_EN_approved_20160203.pdfL-gas:
http://en.gaz-system.pl/fileadmin/pliki/iriesp/en/TNCv25_EN_approved_20160203.pdfPT
http://www.erse.pt/eng/naturalgas/codes/Paginas/OperationofInfraCode.aspxENTSOG BAL NC Monitoring Report 2016 |
63