Table of Contents Table of Contents
Previous Page  50 / 76 Next Page
Information
Show Menu
Previous Page 50 / 76 Next Page
Page Background

Immingham Storage Co Ltd - East Terminal

Gasoline Storage Tanks Overfill Safety Instrument System - Functional Safety Assessment Stage 2/3

P & I Design Ltd

DOCUMENT NO: SI277016_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: D DATE: 25.04.13

Tel: + 44 (0)1642 617444

PAGE 14 OF 33

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

The SRS contains a description of the SIS process output actions and criteria for successful

operation.

The SRS contains a description of the functional relationships between process inputs and

outputs.

The SRS contains a description of the requirements to de-energise to trip

The SRS contains a description of the requirements for reset after a shutdown.

The SRS contains a comment that the allowable spurious trip rate will be approved by

Immingham Storage Company East after the spurious trip calculations are complete

The SRS contains the failure modes and desired response of the SIS

The SRS contains a description of the requirements for reset after a shutdown. There are no

specific requirements for start-up and shutdown of the SIS.

The SRS contains details of interfaces between the SIS and the BPCS

There is only a single mode of operation of the plant and the SRS reflects this.