Immingham Storage Co Ltd - East Terminal
Gasoline Storage Tanks Overfill Safety Instrument System - Functional Safety Assessment Stage 2/3
P & I Design Ltd
DOCUMENT NO: SI277016_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: D DATE: 25.04.13
Tel: + 44 (0)1642 617444
PAGE 15 OF 33
Fax: + 44 (0)1642 616447
www.pidesign.co.ukThere is no requirement for any software as the logic solver consists of individual solid state
relay logic.
The valves are dedicated as an import valves; therefore there is no requirement to override the
SIFs.
The system is designed to fail safe on any fault being detected in the SIS. No reset would be
available.
Mean time to repair shall be 72 hours or less. Immingham Storage Company East to approve
following consideration of availability of spares and labour.
There are no conceivable individually safe process states which, when occurring concurrently,
can create a separate hazard.
Referenced in SRS:
This system will be installed in mainland UK where it will not be subjected to extremes of
temperature or humidity. We do not consider that
grounding, electromagnetic
interference/radiofrequency interference (EMI/RFI), shock, vibration, electrostatic discharge,
flooding or lightning
will have a detrimental effect on the SIS. The system is designed to fail
safe on any loss of electrical power. The individual elements of the system shall be designed
for the process and operating conditions, the environment and the site electrical area
classification. Specifically, all wetted parts should be suitable for Petroleum Spirit.