Immingham Storage Co Ltd - East Terminal

Gasoline Storage Tanks Overfill Safety Instrument System - Functional Safety Assessment Stage 2/3

P & I Design Ltd

DOCUMENT NO: SI277016_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: D DATE: 25.04.13

Tel: + 44 (0)1642 617444

PAGE 16 OF 33

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

There is only a single mode of operation of the plant and the SRS reflects this.

The SRS references valves being designed as fire-safe. No additional reference is made

Valves, actuators and solenoid valve specifications required. (Action 5).

4.4

Are project Design Change Procedures in place and been properly implemented?

Design changes appear to have been conducted but no formal SIS change procedure is

referenced. Immingham Storage Company East to confirm how they will provide

management of change now the system is operational. All documents carry unique document

numbers.

Management of change procedures to be updated to include for the requirements of BS EN

61511. (Action 6)

4.5

Have the recommendations arising from the previous functional safety assessment been

resolved?

Yes, See FSA Stage 1 SI277014_RPT

It was noted that the date of the action completions were not as per the date of the document

revisions. There should be some cross-referencing. (Action 7)