6.3.1.2 Support to the North-West market and bidirectional

Cross-Border flows

The second phase is scheduled for commissioning in September 2018 and involves

the construction of pipelines Cervignano–Mortara (62 km – DN 1400) and

Minerbio–Poggio Renatico (19km – DN1200, already in operation since December

2015), as well as new compression plants in Minerbio (24MW) and Sergnano

(45MW) and the expansion of the existing compression plant in Poggio Renatico

(+25MW).

The total length of new pipelines envisaged by this second project phase is 81km,

for an overall additional compression power of 94MW. These investments will make

available a new capacity of 35MSm³/d (around 375 GWh/d). Summed up to the

capacity already created by the first investment phase, the total reverse flow capacity

available at the commissioning date will reach the level of 40MSm³/d (around

429GWh/d), 22MSm³/d (around 238 GWh/d) at Griespass exit IP and 18MSm³

(around 191 GWh/d) as competing capacity between Griespass exit and Tarvisio exit

IPs.

The project “Support to the North-West market and bidirectional cross-border flows”

is included in ENTSOG TYNDP 2017 with the identification code TRA-F-214.

Mortara

Cervignano

Sergnano

Poggio R.

Minerbio

I T A L Y

Istrana

Zimella

Masera

PassoGries /Griespass

Tarvisio

Gorizia

Cavarzere

Panigaglia

TRA-F-213

TRA-F-214

in operation

in operation

under construction

Figure 6.4:

Support to the North-West market and bidirectional cross-border flows phase 1

(TRA-F-213) and phase 2 (TRA-F-214) (Source: ENTSOG TYNDP)