South-North Corridor GRIP 2017

Table 6.1:

South-North Corridor related PCI projects

(Sources: Annex to Commission Delegated Regulation (EU) 2016/89

and ENTSOG TYNDP)

6.4 PCI Status

Over the last years the importance of the projects

related to the opening of the South-North Corridor

has been underlined by the European Commission

throughout the PCI (Projects of Common Interest)

process.

The following table lists the reverse flow projects on the backbone of the South-North

Corridor that have received the PCI label in the 2

nd

PCI selection round as adopted

in November 2015.

SOUTH-NORTH CORRIDOR RELATED PCI PROJECTS

PCI

TYNDP Code Name

Project Promoter

5.11

TRA-F-214

Reverse flow interconnection between Italy and Switzerland at

Passo Gries interconnection point

Snam Rete Gas S.p.A.

5.10

TRA-F-208

Reverse flow interconnection on TENP pipeline in Germany

Fluxys TENP GmbH &

Open Grid Europe

GmbH

These projects were also part of the very first PCI list in 2013, together with the

project creating physical reverse flow from Switzerland to France.

The Trans-Adriatic Pipeline (TAP) project that will supply the South-North Corridor

with Azeri gas has also been awarded the PCI label, again highlighting the importance

Europe awards to a further increase in diversification of supplies to the EU market.

All projects currently holding the PCI label are part of the ENTSOG TYNDP 2017 and

have endeavored to apply again for a prolongation of this priority status in the 3

rd