Town of Morrisville

2009 Transportation Plan Addendum

(February 2012)

Date

Page

Description of Revision

24 (Map) Change color on Future Roadways map from hatched navy blue (New Four-Lane Boulevard) to hatched green (New

Two-Lane Blvd.) for Carrington Mill Blvd. Extension from the roundabout to Slater Road.

E-2

Add “Phase 1” to Carrington Mill Blvd. Extension

Update “location” for Carrington Mill Blvd. Extension Ph. 1 to indicate the terminus as the roundabout at Lot 5.

Add a new block with Carrington Mill Blvd. Extension Ph. 2 with “location” as roundabout to Slater Road, “Future

Roadway Type” as Two-Lane Boulevard and “Future ROW (feet)” as 75

E-4

Add “Carrington Mill Extension Ph. 2” to the Two-Lane Boulevard inventory

Delete first bullet under Four-Lane Boulevard and add “Carrington Mill Blvd. and Carrington Mill Blvd. Extension Ph. 1”