Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec)

General Information

Promoter

Plinovodi d.o.o.

Operator

Plinovodi d.o.o.

Host Country

Slovenia

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Plinovodi

100%

TRA-N-390

Project

Pipeline including CS

Non-FID

Update Date

22/05/2016

Advanced

Description

Adjustment to operating parameters of the transmission system of the Croatian TSO, increasing the transmission capacity and enabling bidirectional

operation. The project is a part of the PCI 6.26 Cluster Croatia - Slovenia - Austria at Rogatec.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-389 Upgrade of Murfeld/Ceršak interconnection (M1/3 Interconnection Ceršak)

TRA-N-094 &6 .LGULÿHYR QG SKDVH RI XSJUDGH

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Rogatec

Plinovodi d.o.o.

2020

HR

SI

165.0 GWh/d

Plinovodi d.o.o.

2020

SI

HR

165.0 GWh/d