Benefits

Main Driver

Market Demand

Main Driver Explanation

Also essential contribution to Security of supply.

Benefit Description

PCI Details

PCI Benefits

Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Market Integration, Security of Supply

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Upgrade of Rogatec interconnection

The length is 3.8 km.

800

4

Total

4

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

01/2018

11/2019

Market Test

Permitting

12/2015

10/2019

Supply Contracts

FID

01/2018

Construction

01/2019

12/2020

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

Yes (TYNDP for the period 2016-2025)

NDP Number

C12

Currently PCI

Yes (6.26.6)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 533 of 620

Current TYNDP : TYNDP 2017 - Annex A