Eastring - Slovakia
TRA-N-628
Project
Pipeline including CS
Non-FID
Update Date
25/05/2016
Non-Advanced
Description
(DVWULQJ 6. LV VXESURMHFW ORFDWHG LQ 6ORYDNLD 8NUDLQH DQG LV HVVHQWLDO SDUW RI WKH (DVWULQJ SURMHFW ZKLFK FRQQHFWV ,3 9HđNp .DSXäDQ\ DW WKH 6. 8$
border, with a new entry IP at an external border of the EU on the territory of Bulgaria in the following routing options: î from SK to RO î via UA,
(exist. pipeline) î via HU, (new pipeline). î from RO to TR î Option A ² new pipeline passing production & storage area and continuing to IP Isaccea
and to BG/TR border by utilizing existing RO-BG transit assets î Option B ² new pipeline, passing 2 production & storage areas and continuing to an
external border of the EU on the territory of Bulgaria. The project would (i) secure supplies in case of RU disruption and therefore it will increase gas
SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources for Central, Western & Southern Europe and (iii) mean
step towards EU single gas market.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Variant : Eastring - SK-2
+LJK FDSDFLW\ VFHQDULR VWDUWLQJ DW 9HđNp .DSXäDQ\ ,3 DQG SDVVLQJ WKURXJK 6. XVLQJ QHZ
pipeline to new IP at SK-HU border
Point
Operator
Year
From Gas System To Gas System Capacity
Eastring Cross-Border HU/EAR <> SK/EAR
Eastring B.V.
2021
HU/EAR
SK/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
Eastring B.V.
2021
SK/EAR
HU/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
Eastring B.V.
2025
HU/EAR
SK/EAR
570.0 GWh/d
Eastring B.V.
2025
SK/EAR
HU/EAR
570.0 GWh/d
(DVWULQJ 6. ($5 ! 9HđNp .DSXäDQ\
Eastring B.V.
2021
SK
SK/EAR
570.0 GWh/d
Comment: &RQQHFWLRQ RI (DVWULQJ 6. WR H[LVWLQJ 6. WUDQVPLVVLRQ V\VWHP DW 9HđNp .DSXäDQ\ ,3
(VK), New capacity increment from 4Q 2025 to the level of 1140 GWh/d.
Eastring B.V.
2021
SK/EAR
SK
570.0 GWh/d
Comment: &RQQHFWLRQ RI (DVWULQJ 6. WR H[LVWLQJ 6. WUDQVPLVVLRQ V\VWHP DW 9HđNp .DSXäDQ\ ,3
(VK), New capacity increment from 4Q 2025 to the level of 1140 GWh/d.
Eastring B.V.
2025
SK
SK/EAR
570.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 539 of 620
Current TYNDP : TYNDP 2017 - Annex A