Pipelines and Compressor Stations

Eastring - SK-2

+LJK FDSDFLW\ VFHQDULR VWDUWLQJ DW 9HđNp .DSXäDQ\ ,3 DQG

passing through SK using new pipeline to new IP at SK-HU

border

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Eastring-SK-2

Data refers to the first stage - capacity 570 GWh/d for new

route via SK,HU,RO,BG, in case of increase of capacity up to

1140 GWh/d in 2023, compressor power at level of 93 MW will

be needed

1,400

19

52

Total

19

52

Pipelines and Compressor Stations - Alternative Variant

Eastring ² SK-1

+LJK FDSDFLW\ VFHQDULR VWDUWLQJ DW 9HđNp .DSXäDQ\ ,3 DQG

passing through SK using new pipeline to new IP at SK-HU

border with following continuance to RO and BG existing

system

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Eastring-SK-1

Data refers to the first stage - capacity 570 GWh/d for new

route via SK, HU and partly RO and existing route via RO & BG,

in case of increase of capacity up to 1140 GWh/d in 2023,

compressor power at level of 90 MW will be needed

1,400

19

42

Total

19

42

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

05/2016

04/2017

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2021

2025

NDP and PCI Information

Part of NDP

Yes (National Development Plan 2016-

2025)

NDP Number

10.1.2. Eastring

Currently PCI

Yes (6.25.1)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Not Applicable

Considered Tariff Regime

Not Applicable

Applied for Exemption

Not Relevant

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 542 of 620

Current TYNDP : TYNDP 2017 - Annex A