Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

1

Increment at level of 780 GWh/d

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Capacity increase at IP Lanžhot Entry

Capacity increase to 780 GWh/d

Total

Pipelines and Compressor Stations - Alternative Variant

2

Increment at level of 988GWh/d

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Capacity increase at IP Lanžhot Entry

Capacity increase to 988 GWh/d

Total

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

09/2015

08/2017

Market Test

06/2017

Permitting

Supply Contracts

FID

Construction

Commissioning

2019

2019

NDP and PCI Information

Part of NDP

Yes (National Development Plan 2016-

2025)

NDP Number

10.1.2. Lanžhot

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM