PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
1
Increment at level of 780 GWh/d
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Capacity increase at IP Lanžhot Entry
Capacity increase to 780 GWh/d
Total
Pipelines and Compressor Stations - Alternative Variant
2
Increment at level of 988GWh/d
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Capacity increase at IP Lanžhot Entry
Capacity increase to 988 GWh/d
Total
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
09/2015
08/2017
Market Test
06/2017
Permitting
Supply Contracts
FID
Construction
Commissioning
2019
2019
NDP and PCI Information
Part of NDP
Yes (National Development Plan 2016-
2025)
NDP Number
10.1.2. Lanžhot
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 545 of 620
Current TYNDP : TYNDP 2017 - Annex A