Expected Gas Sourcing

Algeria, Caspian Region, Norway, Russia, LNG (HR)

Comments about the Third-Party Access Regime

It is expected that TPA regime and Tariff methodology will be covered by gas primary legislation in accordance with Third Package at least up to the end of 2016.

Benefits

Main Driver

Market Demand

Main Driver Explanation

Project will enable development of natural gas market in the western part of BiH.

Benefit Description

Project will enable development of the natural gas market in BiH. Lower usage of firewood in the energy consumption sector (residential and industrial)

means significant protection of BiH forestry. Project will decrease CO2 emissions. Project will not cause any damaging environmental impact.

Barriers

Barrier Type

Description

Political

Lack of primary gas legislation in accordance with Third Energy Package, as well as energy policy at the state level.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Licka Jesenica - Trzac - Bos.Krupa

Additionally, branches to Bihac and Velika Kladusa are 45 km

length both, diameter 250 mm.

500

35

0

Total

35

0

Schedule

Start Date

End Date

Pre-Feasibility

06/2008

Feasibility

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2023

2023

NDP and PCI Information

Part of NDP

Yes (SPP-Strategic plan and programme of

FBiH)

NDP Number

PTG4

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Not Applicable

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 587 of 620

Current TYNDP : TYNDP 2017 - Annex A