Expected Gas Sourcing
Algeria, Caspian Region, Norway, Russia, LNG (HR)
Comments about the Third-Party Access Regime
It is expected that TPA regime and Tariff methodology will be covered by gas primary legislation in accordance with Third Package at least up to the end of 2016.
Benefits
Main Driver
Regulation SoS
Main Driver Explanation
Project will increase N-1 for Bosnia and Herzegovina and enable flexibility of natural gas system in BiH in case of disruptions, having in mind that currently
BiH gas system is isolated and depending of one supply route.
Benefit Description
Project will improve import route and supply source price diversification. Project will enable development of the natural gas market in BiH. Lower usage of
fire wood in the energy consumption sector (residential and industrial) means seignificant protection of BiH forestry. Project will decrease CO2 emissions.
Project will not cause any damaging environmental impact.
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Posusje-Travnik with branch to Mostar
500
165
0
Total
165
0
Schedule
Start Date
End Date
Pre-Feasibility
10/2013
Feasibility
01/2017
12/2017
FEED
04/2018
06/2019
Market Test
12/2017
Permitting
04/2018
06/2019
Supply Contracts
05/2020
FID
03/2018
Construction
06/2020
09/2021
Commissioning
2021
2021
NDP and PCI Information
Part of NDP
Yes (SPP-Strategic plan and programme of
FBiH)
NDP Number
PTG2
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Not Applicable
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%