Expected Gas Sourcing

Algeria, Caspian Region, Norway, Russia, LNG (HR)

Comments about the Third-Party Access Regime

It is expected that TPA regime and Tariff methodology will be covered by gas primary legislation, all in accordance with Third Package at least up to the end 2016.

Benefits

Main Driver

Regulation SoS

Time Schedule

Grant Obtention Date

Delay Since Last TYNDP

YES

Delay Explanation

Regarding the fact that the part of this project runs through Republic of Srpska Entity, the main obstacle is lack of political support of the RS

official representatives, as well as lack of primary gas legislation at the state level in accordance with the Third Energy Package. Also,existing

natural gas market is not able to cover assessed project cost related to preliminary activities.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Brod-Zenica (section through FBiH and RS)

500

140

0

Total

140

0

Schedule

Start Date

End Date

Pre-Feasibility

02/2006

Feasibility

11/2017

04/2019

FEED

12/2019

04/2021

Market Test

04/2019

Permitting

01/2020

05/2021

Supply Contracts

05/2022

FID

11/2019

Construction

06/2022

09/2023

Commissioning

2023

2023

NDP and PCI Information

Part of NDP

Yes (SPP-Strategic plan and programme of

FBiH)

NDP Number

PTG1

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Not Applicable

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 581 of 620

Current TYNDP : TYNDP 2017 - Annex A