Expected Gas Sourcing
Algeria, Caspian Region, Norway, Russia, LNG (HR)
Comments about the Third-Party Access Regime
It is expected that TPA regime and Tariff methodology will be covered by gas primary legislation, all in accordance with Third Package at least up to the end 2016.
Benefits
Main Driver
Regulation SoS
Time Schedule
Grant Obtention Date
Delay Since Last TYNDP
YES
Delay Explanation
Regarding the fact that the part of this project runs through Republic of Srpska Entity, the main obstacle is lack of political support of the RS
official representatives, as well as lack of primary gas legislation at the state level in accordance with the Third Energy Package. Also,existing
natural gas market is not able to cover assessed project cost related to preliminary activities.
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Brod-Zenica (section through FBiH and RS)
500
140
0
Total
140
0
Schedule
Start Date
End Date
Pre-Feasibility
02/2006
Feasibility
11/2017
04/2019
FEED
12/2019
04/2021
Market Test
04/2019
Permitting
01/2020
05/2021
Supply Contracts
05/2022
FID
11/2019
Construction
06/2022
09/2023
Commissioning
2023
2023
NDP and PCI Information
Part of NDP
Yes (SPP-Strategic plan and programme of
FBiH)
NDP Number
PTG1
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Not Applicable
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 581 of 620
Current TYNDP : TYNDP 2017 - Annex A