Table of Contents Table of Contents
Previous Page  1166-1167 / 1248 Next Page
Information
Show Menu
Previous Page 1166-1167 / 1248 Next Page
Page Background

Gaspipeline Brod - Zenica

General Information

Promoter

BH-Gas d.o.o.

Operator

BH Gas d.o.o.

Host Country

Bosnia Herzegovina

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

BH-Gas d.o.o.

100%

TRA-N-224

Project

Pipeline including CS

Non-FID

Update Date

23/05/2016

Non-Advanced

Description

The starting point of Brod - Zenica gas pipeline is in close vicinity of Brod where it should be connected to the high-pressure gas pipeline

Slobodnica - Brod (TSO ² Plinacro) in the Republic of Croatia. Point of interconnection between Croatian and BiH natural gas transmission network is

Brod/Slavonski Brod. The gas pipeline is planned to be bi-directional, and together with Southern Interconnection BiH/CRO creates a part of EC Gas

Ring.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Slobodnica- Bosanski Brod-Zenica

BH Gas d.o.o.

2023

HR

BA

35.0 GWh/d

Comment: Technical exit capacity from Croatia is 44 GWh/day.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 580 of 620

Current TYNDP : TYNDP 2017 - Annex A