Expected Gas Sourcing

Caspian Region

Benefits

Main Driver

Market Demand

Time Schedule

Grant Obtention Date

Delay Since Last TYNDP

Delay Explanation

Ministry of Energy and Industry of Albania is working in the cooperation with WBIF to prepare the Study of "Gas Master Plan for Albania" and

"Project of Identifican Plan". As soon as this study will be completed by the Consultant COWI-IPF, the final route will be defined. Also, the

Ministries of Albania and Kosovo have applied to WBIF for a grant to prepare a Feasibility Study for this project that will identify the preliminary

and main routes for this project.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Fier ² Lezha (AL) ² Prishtina (KO)

This routing scenario shall be considered in case of not much

progress is encountered with the implementation of IAP.

610

260

Lezha (AL) - Pristina (KO)

This routing scenario assumes that IAP moves forward to the

LPSOHPHQWDWLRQ VWDJHƞ

610

175

Total

435

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

Yes (NDP of AL is in final stage for

approval.)

NDP Number

Energy chapter

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

Yes

Exemption Granted

Yes

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 575 of 620

Current TYNDP : TYNDP 2017 - Annex A