LNG Facility

Eagle LNG

Expected Volume (bcm/y)

8

Storage Capacity (m3)

230,000

Ship Size (m3)

230,000

Reloading Ability

No

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Eagle LNG: Pipeline Albania - Italy

The unit for Lenght is km and the unit for Diameter is mm. The

compressor power is left empty as the LNG will be used to

generate sufficient gas send-out pressure from the FSRU.

Total

Schedule

Start Date

End Date

Pre-Feasibility

01/2006

Feasibility

01/2007

01/2016

FEED

03/2017

03/2018

Market Test

12/2017

Permitting

06/2017

01/2018

Supply Contracts

01/2018

FID

01/2018

Construction

03/2018

01/2020

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

Yes (Italy - Gas Grid NDP - Ministerial

Decree 20.10.15)

NDP Number

Eagle LNG

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Negotiated

Considered Tariff Regime

Negotiated

Applied for Exemption

Not Yet

Exemption Granted

Not Yet

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 571 of 620

Current TYNDP : TYNDP 2017 - Annex A