Technical Information (LNG)
LNG Facility
Eagle LNG
Expected Volume (bcm/y)
8
Storage Capacity (m3)
230,000
Ship Size (m3)
230,000
Reloading Ability
No
PCI Details
PCI Benefits
Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at
supplying directly or indirectly at least two Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Eagle LNG: Pipeline Albania - Italy
The unit for Lenght is km and the unit for Diameter is mm. The
compressor power is left empty as the LNG will be used to
generate sufficient gas send-out pressure from the FSRU.
Total
Schedule
Start Date
End Date
Pre-Feasibility
01/2006
Feasibility
01/2007
01/2016
FEED
03/2017
03/2018
Market Test
12/2017
Permitting
06/2017
01/2018
Supply Contracts
01/2018
FID
01/2018
Construction
03/2018
01/2020
Commissioning
2020
2020
NDP and PCI Information
Part of NDP
Yes (Italy - Gas Grid NDP - Ministerial
Decree 20.10.15)
NDP Number
Eagle LNG
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Negotiated
Considered Tariff Regime
Negotiated
Applied for Exemption
Not Yet
Exemption Granted
Not Yet
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 571 of 620
Current TYNDP : TYNDP 2017 - Annex A