Page Background

Benefits

Main Driver

Market Demand

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Market Integration: The intention of PRF is to enhance interoperability of the Irish and Northern Ireland (UK) gas markets with the Great Britain

(UK) market, in line with the goal of the European Union in achieving an EU Single Market in Gas. Ireland and Northern Ireland (UK) are

currently at the extremity of the EU gas network with no ability to export to Great Britain (UK) and beyond. The PRF projects would allow, for

the first time, trade from Ireland/Northern Ireland (UK) to Great Britain (UK). This opportunity is likely to encourage new gas supply sources in

Ireland and Northern Ireland which in turn would help increase trading opportunities between Ireland, Northern Ireland (UK) and Great Britain

(UK), further enhancing market integration in these regions. Security of Supply: PRF would mean that new gas supply sources (e.g. Corrib) in

Ireland/Northern Ireland can compete which those in Great Britain (UK). In addition, by providing an export option for the first time to Great

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

interconnector 1 & 2

914

100

40

Total

100

40

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

10/2016

12/2017

FEED

01/2018

12/2018

Market Test

10/2016

Permitting

01/2018

12/2018

Supply Contracts

FID

12/2018

Construction

01/2019

12/2019

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

Yes (GNI, Network Development Plan

2015)

NDP Number

PCI 5.1.1

Currently PCI

Yes (PCI 5.1.1/Tran-N-059)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 566 of 620

Current TYNDP : TYNDP 2017 - Annex A