NOWAL - Nord West Anbindungsleitung
TRA-F-291
Project
Pipeline including CS
FID
Update Date
10/05/2016
Advanced
Description
It is necessary to increase the capacity of the pipeline between the OGE Infrastructure (market area of NCG) and GASCADE (Market area of
GASPOOL).This connection will increase the capacity by 6 GW to ensure the supply in south-west Germany.
Regulatory Decisions and
similar material conditions
Part of the Nation Development Plan 2016: 083-07, 409-01, 410-01, 411-01
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Drohne GASCADE / OGE
GASCADE Gastransport GmbH
2017
DEg
DEn
216.0 GWh/d
Comment: Level 1 - Exit Drohne
GASCADE Gastransport GmbH
2020
DEg
DEn
124.8 GWh/d
Comment: Level 2
includes
Level 1 in
total 340.8
GWh/d -Exit
Drohne
GASCADE Gastransport GmbH
2025
DEg
DEn
194.4 GWh/d
Comment: Level 3
includes
Level 1+2 in
total 535.2
GWh/d -Exit
Drohne
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 76 of 620
Current TYNDP : TYNDP 2017 - Annex A