NOWAL - Nord West Anbindungsleitung

TRA-F-291

Project

Pipeline including CS

FID

Update Date

10/05/2016

Advanced

Description

It is necessary to increase the capacity of the pipeline between the OGE Infrastructure (market area of NCG) and GASCADE (Market area of

GASPOOL).This connection will increase the capacity by 6 GW to ensure the supply in south-west Germany.

Regulatory Decisions and

similar material conditions

Part of the Nation Development Plan 2016: 083-07, 409-01, 410-01, 411-01

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Drohne GASCADE / OGE

GASCADE Gastransport GmbH

2017

DEg

DEn

216.0 GWh/d

Comment: Level 1 - Exit Drohne

GASCADE Gastransport GmbH

2020

DEg

DEn

124.8 GWh/d

Comment: Level 2

includes

Level 1 in

total 340.8

GWh/d -Exit

Drohne

GASCADE Gastransport GmbH

2025

DEg

DEn

194.4 GWh/d

Comment: Level 3

includes

Level 1+2 in

total 535.2

GWh/d -Exit

Drohne

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 76 of 620

Current TYNDP : TYNDP 2017 - Annex A