Upgrade IP Deutschneudorf and Lasow
General Information
Promoter
ONTRAS Gastransport
GmbH
Operator
ONTRAS Gastransport
GmbH
Host Country
Germany
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
Compressor station Sayda
ONTRAS Gastransport GmbH
100%
3UHVVXUH UHGXFWLRQ DQG PHWHULQJ VWDWLRQV DW *UR .|ULV
and Kienbaum
ONTRAS Gastransport GmbH
100%
Transmission pipeline Sayda - Deutschneudorf
ONTRAS Gastransport GmbH
100%
TRA-N-814
Project
Pipeline including CS
Non-FID
Update Date
25/05/2016
Advanced
Description
7KH JDV SUHVVXUH UHGXFWLRQ DQG PHWHULQJ VWDWLRQV DW *UR .|ULV DQG .LHQEDXP ZLOO EH XSJUDGHG WR 9Q 0LR P h and Vn 1,7 m h respectively. The
transmission pipeline Sayda - Deutschneudorf will be upgraded to DN 800, DP84. The compressor station Sayda will be upgraded to an inlet
pressure pmin = 41 bar, outlet pressure pmax = 84 bar and throughput Vn 700 Tm h. The pressure transfer to/from FGL 218 (DN 600, DP 84) will be
upgraded to MOPu 84 bar and MOPd 55 bar. These investments will create additional exit capacity to Czechia (at Deutschneudorf IP) and Poland
(Lasow IP) for transit/transmission of natural gas arriving in Germany via Nord Stream 2.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
GCP GAZ-SYSTEM/ONTRAS
ONTRAS Gastransport GmbH
2016
PL
DEg
26.6 GWh/d
ONTRAS Gastransport GmbH
2019
DEg
PL
14.4 GWh/d
Comment: Enabled by EUGAL project submitted by GASCADE
ONTRAS Gastransport GmbH
2019
PL
DEg
45.4 GWh/d
Comment: Entry pressure of 63 bar required by GAZ-System
+RUD 6YDWp .DWHĝLQ\ &= 'HXWVFKQHXGRUI 6D\GD '(
ONTRAS Gastransport GmbH
2019
DEg
CZ
55.2 GWh/d
Comment: Enabled by EUGAL project submited by GASCADE
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 106 of 620
Current TYNDP : TYNDP 2017 - Annex A