Interconnection Bulgaria - Serbia

General Information

Promoter

Ministry of Energy

Operator

IBS Future Operator

Host Country

Bulgaria

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Bulgarian section

Ministry of Energy of Bulgaria

100%

Serbian section

Serbijagas

100%

TRA-F-137

Project

Pipeline including CS

FID

Update Date

27/05/2016

Advanced

Description

IBS aims at connecting the national gas transmission networks of Bulgaria and Serbia. It will be implemented in 3 stages. 1st: a pipe will be built from

Novi Iskar to Kalotina, BG (62.2 km) and from Nis to Dimitrovgrad, SR (108 km), with capacity from BG to SRB - 1,0 bcm/year, and from SRB to BG -

0.15 bcm/year. 2nd: the capacity will be increased from BG to SRB to 2,4 bcm/year, and from SRB to BG to 0,95 bcm/year, and later to 1,5 bcm/year,

by construction of 2 CSs (20 MW each) and 2 new gas pipeline sections (from G Bogrov CS to N Iskar ² km and from V. Orašje to Nis ² km).

3rd: by construction of the looping VS Batulsi - G Bogrov CS (62 km) the capacity from BG to SRB will be increased to 3,2 bcm/year. In the direction

from SRB to BG the construction of the pipeline Batajnica - V Orašje (116 km) will ensure transmission of 2 bcm/ year, and the construction of CS

%DWRÿLQD 0: ZLOO LQFUHDVH WKH FDSDFLW\ IURP EFP \HDU WR XS WR EFP \

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Interconnector BG RS

IBS Future Operator

2018

BGn

RS

51.0 GWh/d

Comment: Opeartor to be defined

IBS Future Operator

2018

RS

BGn

51.0 GWh/d

Comment: Operator to be defined

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM