Expected Gas Sourcing

Caspian Region, LNG (GR)

Benefits

Main Driver

Others

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with

Article 6(3) of Regulation EU, Project concerns investment in reverse flow capacity, Project aims at supplying directly or indirectly at least two

Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Bulgarian territory

1.8 bcm/y maximum capacity

700

62

Serbian territory

1.8 bcm/y maximum capacity

700

108

Total

170

Schedule

Start Date

End Date

Pre-Feasibility

02/2011

Feasibility

12/2011

12/2012

FEED

Market Test

05/2017

Permitting

08/2016

Supply Contracts

04/2017

FID

12/2012

Construction

05/2017

12/2018

Commissioning

2018

2018

NDP and PCI Information

Part of NDP

Yes (2016-2025 Ten-year network

development plan of BTG)

NDP Number

Sectin 5.2 (5.2.3)

Currently PCI

Yes (6.10.)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%