PCI Details

PCI Benefits

Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

$UWqUH GX 1RUG (VW

Total or partial looping

1,050

87

0

Cheppy CS

New compression station to be created depending on the

amount of capacity to be created (total additional

compression power for the 3 stations is equal to 41 MW)

Dierrey CS

Additional power depending on the amount of capacity to be

created (total additional compression power for the 3 stations

is equal to 41 MW)

Morelmaison CS

Adaptation of station functionality

0

Obergailbach interconnection station

Enabling reverse flow

Voisines CS

Additional power depending on the amount of capacity to be

created (total additional compression power for the 3 stations

is equal to 41 MW)

Total

87

0

Schedule

Start Date

End Date

Pre-Feasibility

06/2013

Feasibility

07/2013

06/2017

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

Yes (GRTgaz PDD 2015)

NDP Number

na

Currently PCI

Yes (5.6)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 187 of 620

Current TYNDP : TYNDP 2017 - Annex A