Expected Gas Sourcing

Algeria, Caspian Region, Libya, LNG ()

Benefits

Main Driver

Market Demand

Main Driver Explanation

During last open seaon on the project, shippers have confirmed their interest for reverse capacitites at the Oltingue / Rodersdorf IP.

Benefit Description

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Morelmaison CS

Enable reverse flow from Oltingue

0

Oltingue interconnection station

Enable reverse flow

0

Total

0

Schedule

Start Date

End Date

Pre-Feasibility

12/2010

Feasibility

10/2014

08/2015

FEED

09/2015

12/2016

Market Test

06/2012

Permitting

Supply Contracts

01/2017

FID

07/2015

Construction

03/2017

12/2017

Commissioning

2018

2018

NDP and PCI Information

Part of NDP

Yes (GRTgaz PDD 2015)

NDP Number

na

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%