EastMed Pipeline

TRA-N-330

Project

Pipeline including CS

Non-FID

Update Date

25/05/2016

Non-Advanced

Description

The EastMed project is an approximately 1900 km offshore/onshore pipeline project that will directly connect the East Mediterranean gas resources

to the European gas system. The project consists of 5 sections connecting the following areas: Levantine basin ² Cyprus ²Crete- Peloponnese ²West

Greece-Thesprotia. The system will have a capacity of 320-350 GWh/d with the option to upgrade the capacity of the pipeline sections from Crete up

to 510 Gwh/d, in case relevant reserves will be discovered in the offshore of Crete.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

East Med / Crete (GR)

IGI Poseidon S.A.

2020

GRc

GR/EMD

190.0 GWh/d

Comment: In case relevant gas reserves will be discoveredin the offshore area around Crete

island.

IGI Poseidon S.A.

2020

GR/EMD

GRc

20.0 GWh/d

East Med / Cyprus (CY)

IGI Poseidon S.A.

2020

GR/EMD

CY

30.0 GWh/d

East Med / Cyprus/Israeli Production Field

IGI Poseidon S.A.

2020

NPcCY

GR/EMD

350.0 GWh/d

East Med / Peloponnesus (GR)

IGI Poseidon S.A.

2020

GR/EMD

GR

90.0 GWh/d

East Med / Thesprotia (Poseidon)

IGI Poseidon S.A.

2020

GR/IGI

GR/EMD

320.0 GWh/d

Comment: It could be upgraded for further 190 Gwh/d, in case relevant gas reserves will be

discoveredin the offshore area around Crete

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 236 of 620

Current TYNDP : TYNDP 2017 - Annex A