LNG evacuation pipeline Omišalj - Zlobin (Croatia)

General Information

Promoter

Plinacro Ltd

Operator

Plinacro Ltd

Host Country

Croatia

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Plinacro

100%

TRA-N-90

Project

Pipeline including CS

Non-FID

Update Date

13/07/2016

Advanced

Description

The pipeline is the connection of the LNG on the Krk island with the Croatian gas transmission system. Gas pipeline Omišalj-Zlobin jointly with gas

pipeline system Zlobin - Bosiljevo - Sisak-Kozarac and with gas pipeline Kozarac-Slobodnica makes LNG Main Evacuation Pipeline connecting LNG

from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline is a continuation of the existing Hungary ² Croatia

LQWHUFRQQHFWLRQ JDV SLSHOLQH 9DURVI|OG 'UDYDV]HUGDKHO\ 'RQML 0LKROMDF 6ORERGQLFD ZLOO EH FRQQHFWHG WR WKH IXWXUH ,RQLDQ $GULDWLF 3LSHOLQH ,$3

will be connected to the future LNG solution in Omišalj It will be the "backbone" of the Croatian gas system.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica

TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Croatia LNG

Plinacro Ltd

2018

LNG_Tk_HR

HR

52.2 GWh/d

Dravaszerdahely

Plinacro Ltd

2018

HR

HU

52.2 GWh/d

Comment: It is necessary to use and CS1