LNG evacuation pipeline Omišalj - Zlobin (Croatia)
General Information
Promoter
Plinacro Ltd
Operator
Plinacro Ltd
Host Country
Croatia
Status
Planned
Website
Project's URLPublication Approval Status
Approved
Sponsors
Plinacro
100%
TRA-N-90
Project
Pipeline including CS
Non-FID
Update Date
13/07/2016
Advanced
Description
The pipeline is the connection of the LNG on the Krk island with the Croatian gas transmission system. Gas pipeline Omišalj-Zlobin jointly with gas
pipeline system Zlobin - Bosiljevo - Sisak-Kozarac and with gas pipeline Kozarac-Slobodnica makes LNG Main Evacuation Pipeline connecting LNG
from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline is a continuation of the existing Hungary ² Croatia
LQWHUFRQQHFWLRQ JDV SLSHOLQH 9DURVI|OG 'UDYDV]HUGDKHO\ 'RQML 0LKROMDF 6ORERGQLFD ZLOO EH FRQQHFWHG WR WKH IXWXUH ,RQLDQ $GULDWLF 3LSHOLQH ,$3
will be connected to the future LNG solution in Omišalj It will be the "backbone" of the Croatian gas system.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica
TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Croatia LNG
Plinacro Ltd
2018
LNG_Tk_HR
HR
52.2 GWh/d
Dravaszerdahely
Plinacro Ltd
2018
HR
HU
52.2 GWh/d
Comment: It is necessary to use and CS1
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 286 of 620
Current TYNDP : TYNDP 2017 - Annex A