Compressor stations 2 and 3 at the Croatian gas tranmission system

General Information

Promoter

Plinacro Ltd

Operator

Plinacro Ltd

Host Country

Croatia

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Plinacro

100%

TRA-N-1057

Project

Pipeline including CS

Non-FID

Update Date

14/07/2016

Non-Advanced

Description

Construction of such facilities is necessary due to the opening of the gas market, as well as providing sufficient transmission capacities and natural

gas delivery pressure conditions and for development of the gas market in Croatia and the neighbouring countries. Compressor stations will

significantly increase efficiency of the Croatian gas transmission system. Compressor stations are integral part of the transmission system, integrated

in the system, primarily in a manner to increase the flexibility of managing the existing transmission capacities of the system, and to provide rational

increase of transmission capacities according to user needs, that is, the requirements of the market and to satisfy market conditions arising from the

application of new legal regulation.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-066 Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod)

TRA-N-070 ,QWHUFRQQHFWLRQ &URDWLD 6HUELD 6OREGQLFD 6RWLQ %DÿNR 1RYR 6HOR

TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Croatia LNG

Plinacro Ltd

2020

LNG_Tk_HR

HR

43.3 GWh/d

Dravaszerdahely

Plinacro Ltd

2020

HR

HU

43.3 GWh/d

Plinacro Ltd

2020

HU

HR

62.5 GWh/d