Time Schedule

Grant Obtention Date

24/11/2015

Delay Since Last TYNDP

Delay Explanation

Project depend on LNG project

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Project will connect several, in the future exceptionally important, points of the Croatian gas transmission system. It is the future strategic gas

transmission connector of great significance and is an integral part of the North ² South European Corridor named as the North-South (Baltic ²

Adriatic) Gas Connection. Its purpose is linking the Polish and the Croatian LNG (Liquefied Natural Gas) solutions. This gas pipeline (as well as

all the pipelines to which it connects and the associated gas nodes) will provide gas transmission in all directions, i.e. it will satisfy all

transmission requirements and will maximise the value of the IAP and LNG projects in Croatia and the region. In addition, it will increase the

use of the existing system and the new interconnection with Hungary.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Kozarac-Slobodnica

800

128

Total

128

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

12/2015

10/2016

FEED

Market Test

08/2016

Permitting

09/2014

01/2023

Supply Contracts

FID

01/2020

Construction

01/2021

01/2023

Commissioning

2023

2023

NDP and PCI Information

Part of NDP

Yes (2017-2026)

NDP Number

1.21

Currently PCI

Yes (6.5.2)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

70.00%

Exemption in exit direction

30.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 303 of 620

Current TYNDP : TYNDP 2017 - Annex A