Eastring - Hungary
TRA-N-656
Project
Pipeline including CS
Non-FID
Update Date
27/05/2016
Non-Advanced
Description
(DVWULQJ +8 LV VXESURMHFW ORFDWHG LQ +XQJDU\ DQG LV HVVHQWLDO SDUW RI WKH (DVWULQJ SURMHFW ZKLFK FRQQHFWV ,3 9HđNp .DSXäDQ\ DW WKH 6. 8$ ERUGHU
with IP at the BG/TR border in the following routing options: î from SK to RO î via HU, (new pipeline). î from RO to TR î Option A ² new pipeline
passing production & storage area and continuing to IP Isaccea and then to BG/TR border by utilizing existing RO-BG transit assets î Option B ²
new pipeline, passing 2 production & storage areas and continuing to BG/TR border. The project would (i) secure supplies in case of RU disruption
and therefore it will increase gas SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources for Central, Western &
Southern Europe and (iii) mean step towards EU single gas market.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Eastring Cross-Border HU/EAR <> SK/EAR
FGSZ Ltd.
2021
HU/EAR
SK/EAR
570.0 GWh/d
FGSZ Ltd.
2021
SK/EAR
HU/EAR
570.0 GWh/d
FGSZ Ltd.
2025
HU/EAR
SK/EAR
570.0 GWh/d
FGSZ Ltd.
2025
SK/EAR
HU/EAR
570.0 GWh/d
Eastring Cross-Border RO/EAR <> HU/EAR
FGSZ Ltd.
2021
HU/EAR
RO/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
FGSZ Ltd.
2021
RO/EAR
HU/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
FGSZ Ltd.
2025
HU/EAR
RO/EAR
570.0 GWh/d
FGSZ Ltd.
2025
RO/EAR
HU/EAR
570.0 GWh/d
Eastring HU Domestic Point
FGSZ Ltd.
2021
HU
HU/EAR
570.0 GWh/d
FGSZ Ltd.
2021
HU/EAR
HU
570.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 339 of 620
Current TYNDP : TYNDP 2017 - Annex A