Expected Gas Sourcing

LNG ()

Technical Information (LNG)

LNG Facility

FSRU Independence

Expected Volume (bcm/y)

4

Storage Capacity (m3)

170,000

170.000 m3 of LNG capacity for short period of time due to LNG aging

Ship Size (m3)

170,000

Reloading Ability

Yes

PCI Details

PCI Benefits

Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project aims at

supplying directly or indirectly at least two Member States

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Enhanced security of natural gas supply Diversification of natural gas supply sources Full Third Party access Baltic States connection to the

global gas markets Natural gas prices cap in the region LNG break bulk facility for the Baltic Sea Region Significant economic benefits created

for the region

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

Permitting

Supply Contracts

FID

12/2018

Construction

Commissioning

2024

2024

NDP and PCI Information

Part of NDP

No (NDP covers only TSO investments.

LNG terminal is not a part of TSO network,

therefore NDP does not include LNG

terminal projects. LNG projects are covered

by TYNDP at EU level, not at the national

level.)

NDP Number

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%