Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Baltic Pipe (offshore section)

Power of the compressor station to be determined at a later

stage

900

280

Goleniow - Lwowek pipeline

100

188

Goleniow, Gustorzyn, Odolanow CS

Goleniow CS : 12 MW, Gustorzyn CS : 15 MW, Odolanow CS : 14

MW

Niechorze - Ploty pipeline

1,000

40

Onshore terminal - Niechorze

Total

508

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

03/2016

01/2017

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

Yes (Network Development Plan 2016-

2025)

NDP Number

N/A

Currently PCI

Yes (8.3)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on

30

/1

1

/2016

12

:

26

:19 PM

Page 434 of 620

Current TYNDP : TYNDP 2017 - Annex A