PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Baltic Pipe (offshore section)
Power of the compressor station to be determined at a later
stage
900
280
Goleniow - Lwowek pipeline
100
188
Goleniow, Gustorzyn, Odolanow CS
Goleniow CS : 12 MW, Gustorzyn CS : 15 MW, Odolanow CS : 14
MW
Niechorze - Ploty pipeline
1,000
40
Onshore terminal - Niechorze
Total
508
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
03/2016
01/2017
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2022
2022
NDP and PCI Information
Part of NDP
Yes (Network Development Plan 2016-
2025)
NDP Number
N/A
Currently PCI
Yes (8.3)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on
30
/1
1
/2016
12
:
26
:19 PM
Page 434 of 620
Current TYNDP : TYNDP 2017 - Annex A