Poland - Czech Republic interconnection (PL section)

General Information

Promoter

GAZ-SYSTEM S.A.

Operator

GAZ-SYSTEM S.A.

Host Country

Poland

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Czech section

NET4GAS, s.r.o.

100%

Polish section

Gas Transmission Operator GAZ-SYSTEM S.A.

100%

TRA-N-273

Project

Pipeline including CS

Non-FID

Update Date

09/05/2016

Advanced

Description

The project aims to increase the cross-border capacity between Poland and the Czech Republic by establishing a large transportation corridor that

will allow for flexible transport of gas in Central-Eastern Europe within the North-South corridor. The development of the physical interconnection

between Poland and the Czech Republic will contribute to reinforcement of the effective operation of the gas transmission systems, efficient gas

exchange between the markets, as well as increase of the security of supply not only for Poland and the Czech Republic, but also for the CEE region

E\ HQDEOLQJ WKH VXSSO\ OLQN ZLWK RWKHU (XURSHDQ JDV PDUNHW DQG JOREDO /1* PDUNHW YLD WKH WHUPLQDO LQ ĞZLQRXMğFLH 7KH SURMHFW FRQVLVWV RI 3RODQG

Czech Republic Interconnector (STORK II) and internal transmission projects in Poland and in the Czech Republic. Detailed information on these

projects is provided in subsiquent sections in the project questionnaire.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-247 North - South Gas Corridor in Western Poland

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

+Dģ

GAZ-SYSTEM S.A.

2019

CZ

PL

219.1 GWh/d

GAZ-SYSTEM S.A.

2019

PL

CZ

153.2 GWh/d