Romania-Bulgaria Interconnection (EEPR-2009-INTg-RO-BG)
General Information
Promoter
SNTGN Transgaz SA
Operator
SNTGN Transgaz S.A.
Host Country
Romania
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
Bulgartransgaz
54%
Transgaz
46%
TRA-F-029
Project
Pipeline including CS
FID
Update Date
24/05/2016
Advanced
Description
The interconnection project includes the following objectives: land section (DN 500, PN 40 bar, L= 5,1 km) on the Romanian territory between the
metering station Giurgiu and the Danube undercrossing point on the Romanian shore and the gas metering station in the vicinity of Giurgiu -
SNTGN Transgaz SA is responsible for its implementation; land section (DN 500, PN 40 bar, L = 15,4 km) on the Bulgarian territory, between the gas
metering station Ruse and the Danube undercrossing point on the Bulgarian shore and the gas metering station in the vicinity of Ruse -
Bulgartransgaz EAD is responsible for its implementation; Danube undercrossing by two pipelines (DN 500, PN 50 bar), each pipeline is 2.1 km long
(one main pipeline and one back-up pipeline) the responsibility of their implementation is joint.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Ruse (BG) / Giurgiu (RO)
SNTGN Transgaz S.A.
2016
BGn
RO
14.4 GWh/d
SNTGN Transgaz S.A.
2016
RO
BGn
14.4 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 467 of 620
Current TYNDP : TYNDP 2017 - Annex A