Romania-Bulgaria Interconnection (EEPR-2009-INTg-RO-BG)

General Information

Promoter

SNTGN Transgaz SA

Operator

SNTGN Transgaz S.A.

Host Country

Romania

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

Bulgartransgaz

54%

Transgaz

46%

TRA-F-029

Project

Pipeline including CS

FID

Update Date

24/05/2016

Advanced

Description

The interconnection project includes the following objectives: ‡ land section (DN 500, PN 40 bar, L= 5,1 km) on the Romanian territory between the

metering station Giurgiu and the Danube undercrossing point on the Romanian shore and the gas metering station in the vicinity of Giurgiu -

SNTGN Transgaz SA is responsible for its implementation; ‡ land section (DN 500, PN 40 bar, L = 15,4 km) on the Bulgarian territory, between the gas

metering station Ruse and the Danube undercrossing point on the Bulgarian shore and the gas metering station in the vicinity of Ruse -

Bulgartransgaz EAD is responsible for its implementation; ‡ Danube undercrossing by two pipelines (DN 500, PN 50 bar), each pipeline is 2.1 km long

(one main pipeline and one back-up pipeline) the responsibility of their implementation is joint.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Ruse (BG) / Giurgiu (RO)

SNTGN Transgaz S.A.

2016

BGn

RO

14.4 GWh/d

SNTGN Transgaz S.A.

2016

RO

BGn

14.4 GWh/d