Local Fuel PLC –The Shoreham Oil Terminal
Safety Instrument System LFS-SIS1 - Operation, Maintenance and Modification Lifecycle
P & I Design Ltd
DOCUMENT NO: LF364013_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: B DATE: 16.05.16
Tel: + 44 (0)1642 617444
PAGE 3 OF 11
Fax: + 44 (0)1642 616447
www.pidesign.co.uk1
REVISION HISTORY
Rev Description
A
Original Issue Following 2014 Proof Test
B
Sections 9 / 10 / 11 deleted as information now recorded in other documents
This document will be revised with any additions to or removals from the SIS throughout
the operational lifecycle of the system.
2
INTRODUCTION
This document provides an overview and summery report to ensure that the Safety
Instrument System Life Cycle complies with the requirements of the standard BS EN 61511.
3
SCOPE
Client / Company
-
Local Fuel PLC
Location / Facility
-
The Shoreham Oil Terminal
Plant Unit
-
Spirt Bund / Distillate Bund
Service
-
Storage Tank Overfill Protection
SIS Tag No
-
LFS-SIS1
SIF’s Tag No’s
-
SIF-1, SIF-2, SIF-3 & SIF-4
SIL
-
2
Lifecycle Stages
Stage 4
-
BS EN 61511 Clause 16 - SIS Operation and
Maintenance
Stage 5
-
BS EN 61511 Clause 17 - SIS modification
Detailed in this report are the lifecycle phases, methods of data collection and operational
review.
System performance data is collected to analyse and review the performance of the system
and components against the criteria used for design.
The analysis of the lifecycle phases will be documented in this report and historical data will
be recorded on LF364004_SCH - LFS-SIS1 Testing Lifecycle Matrix. The correct
documenting of system testing provides historical system performance data in order that
testing frequencies and procedures can be verified or modified as required.
The system is owned by Local Fuel PLC. The lifecycle is the responsibility of the system
owners.