Local Fuel PLC –The Shoreham Oil Terminal
Safety Instrument System LFS-SIS1 - Operation, Maintenance and Modification Lifecycle
P & I Design Ltd
DOCUMENT NO: LF364013_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: B DATE: 16.05.16
Tel: + 44 (0)1642 617444
PAGE 8 OF 11
Fax: + 44 (0)1642 616447
www.pidesign.co.uk6
LIFECYCLE PHASE – STAGE 5
6.1
Stage 5 Modification Functional Safety Assessment
Stage 5 Modification - Function Safety Assessment to be carried out prior to any system
modification, testing phases to be allocated at Stage 5 FSA as required.




