Local Fuel PLC –The Shoreham Oil Terminal

Safety Instrument System LFS-SIS1 - Operation, Maintenance and Modification Lifecycle

P & I Design Ltd

DOCUMENT NO: LF364013_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 16.05.16

Tel: + 44 (0)1642 617444

PAGE 11 OF 11

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Shutdown Conditions Proof Testing Flowchart

Proof Test

Scheduled

Hardware

Verification

Fail

Pass

Safe to Continue Test

Report to system

Keeper

No

Yes

AS FOUND

Functional TEST

Fail

Safe to Continue

Test / Fault

Investigation

ATEX Inspection/

Preventative

Maintenance

/ Failure Testing

Report to system

Keeper

Yes

Test Procedure

Pass

Fail

Safe to Continue

Test / Fault

Investigation

Report to system

Keeper

No

Yes

As Left Functional

Test

Pass

Report to system

Keeper

Test Procedure

Test Procedure

Documentation

Verification

Fail

Documentation Suitable

to Initiate Site Test

Report to system

Keeper

No

Yes

Lifecycle Analysis

and Approval

Test Procedure

Test Procedure

Pass

No

Test Procedure

System Failure

Reported