Local Fuel PLC –The Shoreham Oil Terminal

Safety Instrument System LFS-SIS1 - Operation, Maintenance and Modification Lifecycle

P & I Design Ltd

DOCUMENT NO: LF364013_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 16.05.16

Tel: + 44 (0)1642 617444

PAGE 10 OF 11

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

8

SCHEDULING

Frequency

Test Reference

Prior to

Proof

Testing

12 Monthly

60 Monthly

Following

System Fault

or Activation

Modification

LF364011_RPT - LFS-SIS1

Documentation Verification

*

LF364012_RPT - LFS-SIS1

Shutdown Conditions Proof

Testing

*

Physical testing of

SENSING ELEMENTS

Stage 4 Functional Safety

Assessment

Stage 5 Functional Safety

Assessment

LF364013_RPT - LFS-SIS1

Operation, Maintenance and

Modification Lifecycle

LF364004_SCH - LFS-SIS1

Testing Lifecycle Matrix

*

Testing required if any part of the system disturbed, replaced or maintained outside of the

above schedule. *As required following review of fault/ activation.

The Safe Fail Fraction of the Drexelbrook level switch is 93%. Thus as a worst case, if all

dangerous undetected failures are not detected during the annual test, the proof test coverage

can be assumed as 93%. For this case, the following graph shows that the PFD

calc

for the

system remains acceptable (below 5 x 10

-3

) for at least 8 years.