SCOPE
Client / Company
-
Local Fuel PLC
Location / Facility
-
The Shoreham Oil Terminal
Plant Unit
-
Spirt Bund / Distillate Bund
Service
-
Storage Tank Overfill Protection
SIS Tag No
-
LFS-SIS1
SIF’s Tag No’s
-
SIF-1, SIF-2, SIF-3 & SIF-4
SIL
-
2
Lifecycle Stages
Stage 4
-
BS EN 61511 Clause 16 - SIS Operation and
Maintenance
Audience
This document has been produced for use by competent persons knowledgeable in testing
Safety Instrument Systems.
Brief System Description
SIF’s under test are to prevent the overfill of storage tanks when on import.
The system is classified as SIL2.
Full system description in LF364001_MNL The Shoreham Oil Terminal LF-SIS1
Procedure
This procedure outlines the necessary steps required to verify the correct documentation
used for testing and identify modifications to the system since last testing phase.
Detailed in this report are the methods of test for documentation associated with LFS-SIS1.
The results of these tests will be recorded in this report, historical data will be recorded in
report reference LF364013_RPT - LFS-SIS1 Operation, Maintenance and Modification
Lifecycle and schedule reference LF364004_SCH - LFS-SIS1 Testing Lifecycle Matrix.
All faults should be reported to the system keeper. If further work is required the system
keeper will initiate it.